 |
 |
View Pictures of SwitchQuick
- Eight holes drilled into each side rail of the dolly for the strut and its storage bracket.
- Only 15 minutes to install each strut.
- Dolly is not taken out of its regular daily use
- Our team can install, or use your team… It's your choice
- Three minute instructional video outlines "How To" engage and disengage
- Driver will become comfortable hooking a set and backing a set with-in ten to fifteen minutes
- Driver not "Inconvenienced" to learn process.
- A driver can watch the video at the start of their day, and practice through out their shift
- The dolly is prevented from articulating while moving in reverse
- The dolly becomes "One" with the lead trailer for better control
- Switching Time is reduced by one third
- The driver climbs in and out of the tractor fifty percent less
- The dolly is only handled once per drop and once per hook
- Tractor idles less, saves fuel
- Part replacement with-in twenty-four hours
- 1 877 SAFE-SQ-1/www.SwitchQuick.com is your immediate link to customer service
- Each part is designed to be removed and replaced quickly in the very unlikely event of defect or damage, so down time is minimal
- Yard and P+D Optimization Study and Implementation
- SwitchQuick® enables carriers to streamline their yard operation by reducing congestion
- Get trailers to the dock quicker
- Get trailers on the road quicker
- Deliver off of rear trailer
|
 |
 |
 |
 |
|